LeBreton Flats

Zibi - O and Kanaal - Sales and Construction Update

Zibi-condos ottawa.jpg

For everything about the Zibi development - check out the Zibi page HERE.

Zibi development located in both Ontario and Quebec is moving along quite well. The first building, named “O”, is located at 3 Rue Eddy in Gatineau. The second building, named “Kanaal” is located at 6 Booth street in Ottawa.

“O” - has started seeing its new residents take occupancy last week. It is 82% sold of the original 70 units. Of the units that remain, prices range from $339,900 up to 782,900. Sizes of remaining units range from 653sqft to 1362sqft. Some amazing views coming from every single unit. Check out the two storey “Traverse” floorplan, 1362sqft open concept corner unit, complete with 228sqft terrace.

Traverse-Floorplan-Zibi.jpg
Zibi-Ottawa-Corner-Unit-Views.jpg
Zibi-One-Bedroom-South-View.jpg

“Kanaal” - is currently under construction - currently pouring the grade slab. The roof is expected to be finished by February, with the first occupancy around November. The building is currently 89% sold out of the 67 units. Designed by Barry J. Hobin & Associates Architects Inc., Kanaal is a collection of 67 urban condo flats, two-story towns, and flow-through penthouses with private rooftop terraces. 

zibi-kanaal-ottawa-construction.jpg

Looking for more information about pre-construction condos in Ottawa? Fill out the form below to chat!

 

Ottawa Senators at LeBreton Flats - What does it mean for you and Ottawa Real Estate?

major-event-centre-e1453824830241.jpeg

Last week the National Capital Commission announced that it signed an "agreement in principle" with RendezVous LeBreton to redevelop the 21-hectare area located in LeBreton Flats. RendezVous LeBreton is the winning bid to develop the land which is focused around a new NHL arena, 4,000 units of housing, schools, and public space. This agreement is another step in order for things to move forward however, there is still a very long way to go. 

Mayor Jim Watson, who is an NCC board member said “I have lots of ideas on how this thing can be derailed but I don’t want to share them because I want the thing to succeed. We’ve waited 50 to 60 years to get something on that site.” 

The largest hurdle being that both sides must still negotiate a final agreement, including proof that the developers have the financing that is required. At the same time, the federal government will also be asked to approve the undisclosed price for the cleanup, which is being deducted from the sale price of the land. While the City of Ottawa will also be required to approve any zoning amendments. 

In terms of timelines, the NCC said that the goal for construction is to begin in 2019-2020, or in 12 to 24 months. However, keep in mind that it took nearly two full years (April 2016) to get to where we are now. The NCC said it held 40 meetings and 120 hours of talks..... over two years!

IF... IF this moves ahead, will it be a positive for the area? Certainly without question. Aside from the fact that homes/condos in the immediate area are only steps to a LRT stop etc. The demand and then prices will certainly see a boom. There are over a dozen condo high rise buildings within a short walk - Cathedral Hill, The Gardens, the numerous buildings on Laurier, Claridge condos on Lebreton Flats, Zibi buildings, etc.  Especially since as of today some of these buildings are at a steal compared to similar units only minutes away.  These 

There is no question, that these values will rise if the Senators move downtown. Add in the LRT and it is a no-brainer. The question now is will it happen and when. How late can you wait before prices start creeping up? How much will values rise? 

Depending on your level of risk, LeBreton flats might be an area that pays off.

Want to chat about Ottawa real estate? Fill out the form below!

2015 Housing Design Awards Winners

GOHBA Housing Design Awards

Put on by the Greater Ottawa Home Builders Association, the 32nd annual Housing Design Awards are so those in the industry are able to go head to head for recognition of their work in new home and condo construction and renovation in Ottawa. The winners include the city's top builders, designers, architects, and renovators, all competing in a range of categories based on size, budget, and style. There are over 50 awards handed out with some even chosen online by the general public. 

The Wavell Kitchen by Linebox Studio

A few of the winners this year include:

High-Rise Building (50 Units or More)
MInto and Barry J Hobin Architects for The Vibe (Lansdowne Park)

Mid to High-Rise Unit
Claridge Homes for the Lilac model at Fusion Development at LeBreton Flats

Custom Contemporary Kitchen (241sqft or more, $74,999 and under) 
LInebox Studio and Lake Partnership for the Wavell Kitchen

For a full list of this years winners, visit the Ottawa Citizen article here.